The process consisted to move 3,7 x 1,7 m panels and provide them dust free for the gluing. Each layer were taken up from vertical panel shelves, automatically brushed, glued and finally pressed. The task was realized by linking several conveyor stations, including a 270° turnable vaccum lifter and the use of a double-sided brush station.